Project: Supply and Installation of RO Plant at F. Magoodhoo Facility Building
Client: Ministry of National Planning, Housing & Infrastructure
Duration: 90 Days
Value: MVR 5,078,080.00
Description: Supply and installation of two RO plants with a production capacity of 35 m³/day each (total production capacity of 70 m³/day). This includes the installation of a multimedia filter (MMF) system, anti-scalant dosing system, automatic chlorine dosing system, in-house clean-in-place (CIP) system, feed pumps, bag filter filtration, transfer pumps, degasifier, and feed tank installations