Skip to content Skip to footer

Project: Design and Build basis for Construction of water supply Facilities in L. Maavah 
Client:
Ministry of National Planning, Housing & Infrastructure
Duration:
720 Days
Value:
MVR 22,5784,46.61
Description:
The project includes surveying works, EIA studies, initial and final design works, and the construction of an RO facility building. It involves the development of two boreholes, installation of two drinking water tanks (350 m³ each), and one rainwater collection tank (200 m³). Additionally, it includes the installation of two RO plants, each with a capacity of 55 m³/day, and the laying of a water network spanning 9,972 m with 401 house connections. The project also covers the installation of a 1,390 m rainwater network, including a rainwater treatment UF system, brine outfall works, and solar PV installation works.

Third Floor, G. Javaahiru Asseyri,
Ameenee Goalhi, Male’, Maldives
+960 3343997, +960 3329401
info@altecmaldives.com

Copyright © 2023 by Altec Maldives Private Limited. All Rights Reserved.