Project: Design and Build basis for Construction of water supply and Sewerage Facilities in F. Magoodhoo
Client: Ministry of National Planning, Housing & Infrastructure
Duration: 720 Days
Value: MVR 38,210,043.82
Description: The project includes surveying works, EIA studies, initial and final design works, and the construction of an RO facility building. It involves the development of two boreholes, installation of two drinking water tanks (230 m³ each), and one rainwater collection tank (200 m³). Additionally, it includes the installation of two RO plants, each with a capacity of 35 m³/day, and the laying of a water network spanning 5,437 m with 166 house connections. The project also covers the installation of a 930 m rainwater network, including a rainwater treatment UF system, and the laying of a sewer network of 4,761 m, along with two pumping stations, pumping mains, sea outfall, brine outfall works, and solar PV installation works.