Project: Design and Build Basis for Construction of Water Supply and Sewerage Facilities in Dh. Rinbudhoo
Client: Ministry of National Planning, Housing & Infrastructure
Duration: 720 Days
Value: MVR 34,641,602.95
Description: The project includes surveying works, EIA studies, initial and final design works, and the construction of an RO facility building. It involves the development of two boreholes, installation of two drinking water tanks (120 m³ each), and one rainwater collection tank (200 m³). Additionally, it includes the installation of two RO plants, each with a capacity of 30 m³/day, and the laying of a water network spanning 4,622 m with 156 house connections. The project also covers 585 m of rainwater network installation, including a rainwater treatment UF system, and laying a sewer network of 4,530 m with two pumping stations, pumping mains, and sea and brine outfall works, as well as solar PV installation works.