Skip to content Skip to footer

Project: Supply and Installation of RO Plants at K. Dhiffushi Water Operation Centre
Client: Altec Utilities
Duration: 75 Days
Value: MVR 6,104,000.00
Description: Supply and installation of two RO plants with a production capacity of 450 m³/day. This includes the installation of a multimedia filter (MMF) system, feed pumps, bag filter filtration, transfer pumps, degasifier, and feed tank installations.

Third Floor, G. Javaahiru Asseyri,
Ameenee Goalhi, Male’, Maldives
+960 3343997, +960 3329401
info@altecmaldives.com

Copyright © 2023 by Altec Maldives Private Limited. All Rights Reserved.