Skip to content Skip to footer

Project: Supply and Installation of RO Plant at Lh. Madivaru Airport
Client: Madivaru Domestic Airport
Duration: 45 Days
Value: MVR 3,654,540.00
Description: Supply and installation of one RO plant with a production capacity of 100 m³/day. This includes the installation of a multimedia filter (MMF) system, feed pumps, bag filter filtration, and transfer pumps.

Third Floor, G. Javaahiru Asseyri,
Ameenee Goalhi, Male’, Maldives
+960 3343997, +960 3329401
info@altecmaldives.com

Copyright © 2023 by Altec Maldives Private Limited. All Rights Reserved.